US Utility Services Australia

Hydroshare
Product Trial
  • About Us
    • Community
  • Services
    • Acoustic Leak Detection
    • Air Scouring
    • Hydrographic Services
    • Out of Hours Call Services
    • Pipe Lining
    • Pipe Rehabilitation
    • Plumbing Services
    • Quick Lock - CCTV Pipe Repair
    • StreetScape
    • Traffic Management
    • Video Demonstrations
  • Solutions
    • Design & Construction
      • Pressure Sewer System
    • Operations
      • Water Supply System
      • Sewerage System
      • Sewage Treatment Plant
      • WQ Risk Management
      • Continuous On Line Testing
      • Treatment Plants
    • Maintenance
      • Water
      • Wastewater
      • Mechanical & Electrical
    • Systems
      • Asset Management
      • Asset Information Systems
      • SCADA System Management
      • Energy Management
      • Works Management Systems
      • Watershed
      • Corrosion Mitigation
      • G Water
      • HydroShare web based monitoring
  • Products
    • Blok Aid
    • Burst Aid
    • Easy Lift & Safety Grate
    • Manhole Safety Ring
  • News
    • New Hydroshare System
    • Compact Pipe Installation
      • Compact Pipe Installation Photos Part 1
      • Compact Pipe Installation Photos Part 2
      • Compact Pipe Installation Photos Part 3
    • Metrowater Update
    • Events
    • Media Releases
    • Asset Beautification Program
    • Projects
      • Rye Coastal Backlog Sewerage Scheme
      • Dorset Square Car Park, Boronia
      • Flinders / Shoreham Backlog Sewerage Scheme
      • HydroShare for Barwon Water, Geelong
      • Munroe Avenue, Edithvale - Road Reconstruction
    • Archived Media & News
      • Metrowater - contract in New Zealand
  • Contact
    • Join our mailing list

News

  • New Hydroshare System
  • Compact Pipe Installation
    • Compact Pipe Installation Photos Part 1
    • Compact Pipe Installation Photos Part 2
    • Compact Pipe Installation Photos Part 3
  • Metrowater Update
  • Events
  • Media Releases
  • Asset Beautification Program
  • Projects
  • Archived Media & News
  • You are here:
  • Home>
  • News>
  • Compact Pipe Installation>
  • Compact Pipe Installation Photos Part 1

Compact Pipe Installation

Compact Pipe Installation Photos Part 1

 

The First Installation and Training Session
29 - 30 April 2005

Shown below are a number of photos taken at the first installation of Compact Pipe.

Click on the photos below to see the larger version.

If you have any further questions please email on kevin.hutchings@usus.com.au

The Control Module and CCTV truck

The Control Module and CCTV truck

Control Module

Control Module

Marcus looking very relaxed

Marcus looking very relaxed

Traffic Management

Traffic Management

A "perf" peg had been inserted and needed to be removed

A "perf" peg had been inserted and needed to be removed

The Control Unit is transported to site by Semi Trailer

The Control Unit is transported to site by Semi Trailer

The original pipe is jetted and then videoed

The original pipe is jetted and then videoed

The new pipe. White for sewer, blue for water and yellow for gas

The new pipe. White for sewer, blue for water and yellow for gas

The pipe is winched through

The pipe is winched through

Thermal welding the flanges

Thermal welding the flanges

Wim - with arms folded!

Wim - with arms folded!

Torsten - The Instructor

Torsten - The Instructor

Torsten - All is going to Plan!

Torsten - All is going to Plan!

Eductor driver watching from the mound

Eductor driver watching from the mound

From inside the Control Module

From inside the Control Module

Butt welding

Butt welding

Butt welding

Butt welding

The pipe is delivered to site on large coils.

The pipe is delivered to site on large coils.

Blatant Advertising

Blatant Advertising

Getting ready to steam

Getting ready to steam

 
Static image of Flash animation
  • Sitemap
  • Site Info
  • Website Designers
  • Home
SkillsEDIT - Website Content Management System